Shenzhen Aglare Lighting Co., Ltd.
Main products:LED Lighting Products (LED Module, Amusement LED Lamp, LED Strip, LED Bulb, LED Spotlight)
Products
Contact Us
  • Contact Person : Mr. Cheng Jun
  • Company Name : Shenzhen Aglare Lighting Co., Ltd.
  • Tel : 86-755-88868631
  • Fax : 86-755-27659398
  • Address : Guangdong,Shenzhen,Factory A, Supplying and Marketing Cooperative Park, Guanlan Avenue, Guanlan Town, Bao'an District, Shenzhen, 518110 China
  • Country/Region : China
  • Zip : 518110

T10 144pcs of 2835SMD 9W 0.6m stripe shape led light tube with CE and ROHS

T10 144pcs of 2835SMD 9W 0.6m stripe shape led light tube with CE and ROHS
Product Detailed
1.No starter, or stroboscopic 2.No harmful ultraviolet, mercury or radiation 3.Excellent heat comsuption 4.With CE and ROHS

t10 led light tube 4500k WITH FIRE-RESISTANT PC MATERIAL

 

Specificatiton parameter:                                           

Part Number

Emitting Color

Input Voltage

Wattage

Color

Temperature (k)

PMMA

Cover

LED Quantity

Luminous Intensity(Lm)

MIN

MAX

MIN

MAX

YJ-T10SB144WW

Warm white

AC90~

260V

50-60HZ

9W

2700

4500

1/4 Stripe

3/4

Al

144pcs

600

900

YJ-T10SB144PW

Pure white

9W

5000

6500

144pcs

800

1000

YJ-T10SB144CW

Cool white

9W

7000

12000

144pcs

900

1000

YJ-T10SB144R

Red

9W

/

/

144pcs

100

180

YJ-T10SB144G

Green

9W

/

/

144pcs

450

650

YJ-T10SB144B

Blue

9W

/

/

144pcs

150

220

YJ-T10SB144Y

Yellow

9W

/

/

144pcs

100

180

Characteristic:                                                            

LIGHT EMITTING DIODE LAMPS

Absolute maximum ratings                  (Ta=25°C)

 

Symbol

Value

Unit

Forward current

If

20

mA

Reverse voltage

Vr

5

V

Power dissipation

Pd

72

mW

Operating temperature range

Top

-25~+55

°C

Storage temperature range

Top

-25~+80

°C

Peak pulsing current(1/8 duty f=1KHz)

If

125

mA

Dimension:                                                                   

Installation:                                                                   

Replace Method: ( Note: It's an electronic start up tube light. The ballast must be taken out before using. 

Direct replacement is not allowed.)

1.    First remove the fluorescent tubes from the lamp stent.

2.   Remove the ballast and the starter: if it’s an electronic ballast, please remove it in accordance with the figure and figure. Figure is the former circuit and figure is the updated circuit; if there are the inductance ballast and the starter, please remove them in accordance with the figure and figure. Figureis the former circuit and Figure is the updated circuit. Be sure to use this LED energy-saving lamp according to the circuit of Figure or the circuit of Figure.

3.    Install the LED energy-saving lights at the original location of the fluorescent tubes.(Notice: The light must install downward)

4.    Rotate the tube lightly and make illumination angle good

Or for easy installation:                                               

Comparion:                                                                    

Incandescent

(50w)

T10 Light bulbs

(0.6M)

T10 LED bulbs

(0.6M)

Working life

1000-2000H

3000-5000H

30000-50000H

Luminance

1000LM

1000LM

1000LM

Power dissipation

50W

20W

9W

Schematic: 

                                                     

Explain:  

                             

Application:                                                                 

Package details:                                                         

Protect Coat Size

(cm)

Qty/ Protect coat

(PCS)

Into Box Size

(cm)

Qty/Into BOX

Outside coat Size

Qty/ Outside coat

Total Weight

(kg)

124*4*4

2

124*22*4.2

10

124*22*17.5

20

10

After-sales service:                                                    

All products have one year quality guarantee under right and normal using condition. Quality warranty is based on correct conservation, assemblage, use and maintenance. In case problem within promised time, “Aglare” will solve it by repair, substitute accessories or replace at your option. Upon exceeding the promised time, there will be material and maintenance fees to be paid.



Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.